Varied Blog

Where Creativity Meets Versatility - Varied Blog

Temporary EV Fleet Charging Made Simple With a Standalone EV Charging Unit

4 min read
6d935a695f5ee681e66d69a3fd38ff75

Fleet operators often need charging before permanent infrastructure is ready, or more charging than their depot can supply for a few weeks or months. A standalone EV charging unit, one that carries its own battery and needs no permanent installation, bridges these interim periods neatly. MPMC's BCH Series units arrive, connect to whatever supply is available and deliver fast DC charging within 24 hours, then move on when the temporary need is over.

Temporary Charging Scenarios for Fleets

Before the Permanent Connection Arrives

When a depot is waiting for a grid upgrade or new chargers, BCH units let the operator put electric vehicles into service immediately. The BCH-275-200 delivers 150 kW from just 80 kW of input, so a modest temporary supply can still charge a growing fleet.

The larger BCH-600-400 and BCH-500-1000 do the same for electric HGV fleets, delivering 400 kW and 500 kW through two 350 A CCS2 guns while drawing 280 kW and 560 kW respectively.

Seasonal Peaks and Pilot Programmes

Delivery fleets that expand for peak seasons, and operators trialling their first electric vans or trucks, can add charging capacity for exactly the period needed. Rental companies, a core MPMC customer group, buy BCH units to offer this flexibility to their own customers.

Because the units are standalone, the same equipment can be redeployed after the peak to another depot or project, keeping utilisation high across the year.

Depot Moves and Temporary Sites

When a fleet relocates, operates from a temporary base or supports a project site, the charging moves with it. The BCH-275-200 rides on a 3.5-tonne trailer with forklift pockets, and the compact 880 kg BCH-80-70 fits into tight corners of a yard.

6d935a695f5ee681e66d69a3fd38ff75

MPMC BCH-275-200 and BCH-80-70 mobile BESS chargers charging electric cars side by side.

Table 1. Standalone BCH units for temporary fleet charging

Model

DC output

Storage

Format

Temporary role

BCH-80-70

80 kW, 1 x CCS2 260 A

70 kWh

880 kg compact unit

Small fleets and tight spaces

BCH-275-200

150 kW, 2 x CCS2 250 A

203.5 kWh

3.5 t trailer

Interim depot charging; easy relocation

BCH-600-400

400 kW, 2 x CCS2 350 A

407 kWh

Heavy-duty unit

Temporary HGV charging

BCH-500-1000

500 kW, 2 x CCS2 350 A

1,075 kWh

20' GP container

Large interim hubs

Note: The table shows selected models; the BCH Series also includes the BCH-60-70 and BCH-800-600.

Why Standalone Units Work So Well

Each BCH unit is self-contained: battery, power conversion, charging guns and EMS in one enclosure, with no grid reconstruction or on-site wiring. The BCH-275-200's plug-and-play fast output box connects in minutes, and the unit can recharge from a public fast charger through its CCS2 DC input in about one hour, so it keeps working even where site power is available for a few hours a day.

Blade LFP battery packs rated for 6,000 cycles at 90% depth of discharge, sealed liquid cooling and C4 anti-corrosion coating make the units robust enough to move from one temporary assignment to the next year after year.

OCPP 1.6 and an open API connect units to existing fleet software for the duration of the temporary deployment, and optional RFID payment supports shared use. Units also supply AC power for site cabins and tools, from 125 kW on the BCH-275-200 to 500 kW on the BCH-500-1000.

Integrated SCADA and EMS automate operation and provide full remote monitoring and control, so a fleet manager can track charging across several temporary sites from one office.

3a38c54c2924c80e1f8e10624dc00b06

MPMC BCH-80-70 compact mobile storage and charging unit being positioned beside parked vehicles.

Table 2. Temporary needs and BCH capabilities

Temporary need

BCH capability

Result

Charging from day one

Full operation within 24 hours

Vehicles in service immediately

Modest temporary supply

Battery buffering; 80-560 kW AC input

High charging power from a small connection

Frequent relocation

Trailer, compact and container formats

Charging moves with the fleet

Off-grid periods

CCS2 DC input; genset or solar input

Recharge anywhere

Software continuity

OCPP 1.6, open API, RFID

Same fleet platform throughout

BCH units are proven in European fleet operation, including eight BCH-275-200 units at a UK logistics port. The BCH-80-70 carries a 1-year or 60 MWh system warranty and a 3-year or 200 MWh battery warranty, and the BCH-275-200 and larger models a 3-year system and 5-year battery performance warranty.

Arranging Temporary Fleet Charging With MPMC

• Describe the fleet, the temporary period and daily energy need

• Note the power supply available on site

• Choose compact, trailer or container formats

• Connect units to your fleet software through OCPP 1.6

• Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a temporary charging plan

https://www.mpmc-group.com/
MPMC Powertech Corp.

About Author

Leave a Reply

Your email address will not be published. Required fields are marked *